Something very behind schedule is ____ ____ ___Word Craze Level 1612 answer

The answer to the Word Craze clue “Something very behind schedule is ____ ____ ___” from Level 1612 (Chile) is shown below. It has 11 letters.

Answer

11 letters
LONGPASTDUESomething very behind schedule is ____ ____ ___ = LONGPASTDUE

About this level

Level1612
DestinationChile
Clues12
This clue2 of 12

Level 1612 is part of the Chile chapter of Word Craze, which covers levels 1585–1644. The level has 12 clues, and this is clue 2.

All Level 1612 clues →

Same clue in other puzzles

  1. LONGPASTDUELevel 816 · South Africa›